Mining Hosting:
La façon simple de miner des cryptomonnaies
Vous souhaitez miner sans exploiter votre propre site ? Avec LeedMiner, vous pouvez acheter des ASIC haute performance pendant que notre équipe vous met en relation avec des prestataires d’hébergement fiables. Notre expérience et notre réseau mondial vous aident à construire un plan de minage durable.
- Locations
- 4 regions
- Starting power
- $0.055/kWh
- Provider handoff
- Contract first
4Sites d'hébergementEnergy sites
Sites d'hébergement
Indiquez le modèle ASIC, la quantité, la date cible et le site souhaité. Le prestataire confirmera la capacité et le contrat avant expédition.




LeedMiner introduces independent hosting providers. Review all service terms and sign a contract with your selected provider before deployment. Hosting service and support are provided by the selected provider.
ASIC hosting cost model
Compare Bitcoin miner hosting electricity cost by ASIC
This table uses current public catalog hashrate and nameplate power to estimate 30 days of continuous operation, then applies the lowest and highest listed hosting electricity rates on this page.
Listed hosting electricity range: $0.055–$0.075/kWh| ASIC miner | Cooling | Hashrate | Power | Efficiency | 30-day energy | 30-day electricity range |
|---|---|---|---|---|---|---|
| Antminer S23 XP Hyd (600Th) | Hydro | 600 TH/s | 5 340 W | 8,9 J/TH | 3 845 kWh | 211,46 $US–288,36 $US |
| Antminer S23 Hyd (563Th) | Hydro | 563 TH/s | 5 510 W | 9,79 J/TH | 3 967 kWh | 218,20 $US–297,54 $US |
| Antminer S23e U2H Hyd | Hydro | 865 TH/s | 8 650 W | 10 J/TH | 6 228 kWh | 342,54 $US–467,10 $US |
| Bitdeer Sealminer A3 Pro Hydro | Hydro | 660 TH/s | 8 250 W | 12,5 J/TH | 5 940 kWh | 326,70 $US–445,50 $US |
| Whatsminer M73S+ | Hydro | 570 TH/s | 7 125 W | 12,5 J/TH | 5 130 kWh | 282,15 $US–384,75 $US |
| Whatsminer M76S+ | Air | 416 TH/s | 5 200 W | 12,5 J/TH | 3 744 kWh | 205,92 $US–280,80 $US |
| Bitdeer Sealminer A3 Pro Air | Air | 290 TH/s | 3 625 W | 12,5 J/TH | 2 610 kWh | 143,55 $US–195,75 $US |
| Whatsminer M70S+ | Air | 262 TH/s | 3 275 W | 12,5 J/TH | 2 358 kWh | 129,69 $US–176,85 $US |
Formula: nameplate power × 24 hours × 30 days. The estimate covers electricity only and excludes setup fees, management, repairs, downtime, curtailment, pool fees, and coin-price changes. Confirm final terms in the provider contract and against metered usage.
Mining hosting FAQ
ASIC miner hosting places mining hardware in a third-party facility that supplies power, networking, cooling, monitoring, and on-site operations. Miner purchase, hosting contract, and mining payouts should be reviewed separately.
Process
Comment commencer ?
Operations fit
Pourquoi choisir l’hébergement ?
Vous rencontrez ces difficultés ?
Vous n’avez pas le temps de maintenir votre ferme de minage ?
Vous voulez miner mais vous n’avez pas votre propre site ?
Vous manquez de connaissances techniques pour miner ?
Le coût de l’électricité est trop élevé dans votre région ?
L’hébergement vous aide à résoudre ces problèmes.
Techniciens disponibles pour maintenance et réparation
Installations sûres et fiables
Amélioration du ROI
Réduction du délai de retour sur investissement
Bénéficiez de tarifs électriques plus bas

