- Catalog total load
- 5.5 kW max
- Miner positions
- To be confirmed
- Electrical input
- Single-phase 220-240V 50/60Hz
Miner referenceReview the exact miner model
Mining infrastructure · Hydro cooling
Match mining equipment to your heating needs and water-loop conditions.

01 / System collection
Miner referenceReview the exact miner model
System planning

Review heat demand, the intended miners and their operating schedule together.
Review heat exchange, circulation, controls and the existing heating interfaces.
Include summer heat rejection, inspection access and the operating budget.
Equipment: confirm system model, quantity, included components, miner inclusion and spare parts in the quotation.
Site work: agree transport, unloading, foundations, external connections, installation and commissioning responsibilities separately.
Power & cooling

Compare equipment input with the available site voltage and capacity. Include auxiliary loads, protection, monitoring and expansion requirements.
Already have a transformer or cooling plant? Share its nameplate, drawings and operating records to review what can be retained.
Discuss site interfaces ↗Start with your project
Share what you know. We’ll review the miner, site requirements and scope before confirming a configuration.
System collection:Heating systems
Miner referenceReview the exact miner model
Miner referenceReview the exact miner model
Start with the project country, miner models and target capacity if known. Site power, cooling conditions and your equipment list help define the configuration.