HébergementBlog
ProduitsSolutions conteneurClassement de rentabilitéHébergementBlogÀ propos de nousMore
PanierLeedMiner

Votre panier est vide

Parcourez les produits ou envoyez une demande de devis lorsque vous êtes prêt.

Voir les mineurs
Accueil/Blog/ASIC Miner Delivery Damage: What to Record Before Power-On
Retour au blog

ASIC Miner Delivery Damage: What to Record Before Power-On

Guide de minage16 novembre 20268 min de lecture
16 novembre 20268 minutes de lectureMis à jour 20 novembre 2026

Document carton damage, preserve packing materials and prepare a clear support record before installing an ASIC miner. Includes a receiving-evidence template.

Par LeedMiner Editorial
XFacebookLinkedIn
ASIC delivery damage: evidence before power

Sommaire

1. Record the carton before the scene changes2. Keep the packing sequence and equipment identity together3. Send a usable evidence package and track the next decisionBefore your next delivery

Partager l'article

XFacebookLinkedInPinterestWhatsAppTelegram

If an ASIC miner arrives in a damaged carton, preserve the delivery evidence before connecting power. Photograph the packaging, keep the unit and its packing materials together, and contact the seller and the relevant carrier through their official support channels. A crushed corner is an observation; it is not yet a diagnosis, a warranty decision or proof of who caused the damage.

This guide covers the receiving record between delivery and installation. It does not replace the carrier's claim process or the exact model's installation instructions. The checklist below is a proposed workflow, not a report of a customer incident. Carrier examples refer to the linked regional pages; check the rules for your actual shipment.

1. Record the carton before the scene changes

Start with a shipment identifier, delivery date and time, receiver, and number of packages. If several cartons arrive together, give each a temporary receiving ID. Keep that ID in every photo filename and observation so a damaged box cannot later be confused with an undamaged machine from the same order.

Illustrated carton with a blank label and a checklist for recording exterior condition before unpacking.
Record the unopened carton first. AI editorial illustration, not evidence of a shipment.

BITMAIN's damaged-package guidance describes checking for wet, flattened, punctured or dented packaging and photographing its condition before opening. It also distinguishes external miner damage from the carton inspection. Use those categories to describe what you can actually see, rather than recording only “bad delivery.”

For the receiving team's own record, take a wide photograph showing the entire carton and close views of the affected area. Include the label in a separate readable photograph. Keep the original files in a restricted folder; addresses, tracking numbers and unit identifiers do not belong in a public social post. A redacted sharing copy should remain separate from the original.

Describe location and extent in ordinary language: “lower right corner compressed” is more useful than “carrier broke it.” Record whether the box was already open when received, whether a seal appeared disturbed, and which surfaces you could inspect. If a pallet prevented you from seeing the underside, write “underside not inspected” rather than checking every surface as passed.

Ask the carrier how an observed exception should be recorded on that delivery. Follow its instructions and the seller's shipment-specific process before arranging a return or refusing a consignment. A general article cannot establish which action protects a particular claim. Keep the delivery record and support reference with the photographs, including any instructions received while the driver was present.

Opening a second box before identifying the first is an avoidable source of confusion. For a multi-unit order, use a simple one-carton-at-a-time workflow. If another person takes over, record the handover before moving the packaging to a different bench or storage area.

2. Keep the packing sequence and equipment identity together

Once the relevant instructions allow unpacking, record each layer before removing it. The objective is to preserve how the contents were supported and which materials belonged to which carton. Keep the receiving inspection separate from an electrical test: an externally inspected unit has not automatically passed commissioning.

Illustrated empty carton and protective inserts showing the packing sequence to document before installation.
Keep each unit associated with its packing materials. AI editorial illustration.

UPS's US supporting-document guidance requests photographs of the damaged item in its packaging, the shipping label and the outside of the package, along with box dimensions. It also calls for a specific merchandise description. These are examples of evidence a carrier may request, not a universal checklist for every service or country.

For a miner, connect the carton record to the exact model and the readable unit identifier. Compare the actual label with your order and packing list. If something differs, record both values and ask the seller to reconcile them. Do not relabel a machine or replace an unreadable character with a guess. Our Antminer serial-number and warranty lookup guide explains the separate step of checking the manufacturer's record.

Do not power on equipment that appears damaged. BITMAIN's precautions explicitly advise against using a visibly damaged miner and direct users to support when damage or loose heat sinks are found. Keep this inspection external; do not dismantle a unit or improvise an energized test to obtain a more dramatic photograph.

Use a clear internal hold status, for example “received; visible condition recorded; installation not released.” Keep the box, inserts, accessories and machine associated with the same receiving ID. Do not flatten cartons, discard damaged foam, mix accessories between units or clean away evidence before receiving the relevant instructions.

A separate installation review should follow once the hold is resolved. For the air-cooled Antminer S21 XP 270 TH/s example below, BITMAIN lists typical power of 3,645 W at 25°C and an input range of 220–277 V AC. These model-specific requirements show why a successful receiving inspection is not permission to plug a miner into an arbitrary available socket. They do not describe its shipping condition.

Antminer S21 XP 270 TH/s

Official catalog image of the air-cooled Antminer S21 XP 270 TH/s used as a model-specific installation example.
Antminer S21 XP 270 TH/s — catalog photo.

Air cooling · 270 TH/s · Typical 3,645 W and 13.5 J/TH at 25°C. Confirm the exact unit and installation requirements.

View current product details

3. Send a usable evidence package and track the next decision

Give the case one owner and one chronological record. The receiver may capture the photographs, purchasing may hold the invoice, and technical support may decide whether testing is appropriate. Consolidating those records prevents conflicting accounts and makes it clear who must act next.

Illustrated folder and carton with a checklist for organizing original photos, observations and the next instruction.
Maintain one evidence record and one case owner. AI editorial illustration.

FedEx's claim FAQ identifies the tracking or PRO number and supporting documents as starting information. It says to retain original packaging for possible inspection until the claim is resolved. Do not assume that uploading photographs removes the need to retain the physical materials.

The following template is an editorial recommendation for organizing your own files. It is not a carrier form, an acceptance certificate or a claim approval. Complete it with observed information; leave an explicit “not recorded” where a fact is unavailable.

RecordWhat to retainWhy it helps
Shipment identityOrder reference, tracking number, delivery time and carton IDLinks the incident to the correct consignment
Observed conditionOriginal photos, location of damage and inspection limitsSeparates observations from assumptions
Equipment identityModel, private serial record and packing-list comparisonConnects the carton to the actual unit
Supporting documentsInvoice, delivery record and relevant correspondenceLets the responsible party review the case
DispositionCase owner, reference, current hold and written next instructionPrevents an unauthorized test, return or disposal

A concise first message can follow this sequence: identify the order and carton; state when it arrived; describe the visible exception; explain whether it has been unpacked or powered; attach an indexed set of photographs; ask for the next inspection or return instruction. Report uncertainty directly. “Cause unknown” is preferable to an unsupported statement about handling or internal failure.

Check notification deadlines promptly with the seller and carrier for the applicable route and service. Do not transfer a deadline from an old manufacturer article or another country's carrier page. Keep evidence that a report was submitted, and distinguish “submitted,” “additional evidence requested” and “resolved” in the internal record. None of those statuses should silently become “replacement approved.”

When written instructions arrive, save them before taking the next step. If inspection, return or replacement is authorized, record the receiving ID and any new shipment reference. If a unit remains in storage, continue the deployment-storage record. Close the receiving case only when its disposition and any remaining installation hold are explicit.

Before your next delivery

Prepare the receiving ID, evidence folder and responsible contact before the shipment arrives. For a LeedMiner order, use your order's support channel with the exact model and shipment reference. A clear receiving record makes the next decision easier without promising a particular claim outcome.

Articles associés

Backup pool verification guide with a real photograph of mining machines.21 novembre 2026Mining Pool Failover: Verify Backup Connections Before You Need Them

Review backup pool dependencies, prepare a controlled check and distinguish connectivity from automatic failover.

LeedMiner guide to Antminer fan RPM, alerts and service records, with a real photograph of mining equipment.19 novembre 2026Antminer Fan Status: Read RPM, Alerts and Support Records

Separate fan settings from measured RPM, preserve alert context and prepare a useful service handover.

Litecoin and Dogecoin merged mining editorial cover featuring the approved Antminer L9 catalog photograph26 septembre 2026Why Litecoin Is Rising—and What LTC Miners Should Watch

An LTC price rally does not tell the whole Scrypt mining story. Compare Litecoin and Dogecoin revenue together, and dedu

Besoin d'aide ?

Loading security check…

Leedminer propose des prix compétitifs sur les mineurs pour accélérer votre retour sur investissement.

+86 133 5291 7253info@leedminer.com

Informations

  • Boutique
  • Mon compte
  • Rentabilité des mineurs
  • Liste des monnaies
  • Compte à rebours du halving
  • Blog

Assistance

  • Nous contacter
  • FAQ
  • Moyens de paiement
  • Retours et garantie
  • Conditions générales
  • Politique de confidentialité

Entreprise

  • À propos de nous
  • Notre équipe
  • Salons
  • Partenaires
  • Prévention de la fraude
LEEDMINER

© 2017-2026 LeedMiner Tous droits réservés. Langue de la boutique Français · leedminer.com

Nous utilisons des cookies pour améliorer votre expérience.

Paramètres des cookies

Nous utilisons des cookies essentiels pour le panier et les sessions de compte. Les scripts optionnels d’analyse et de marketing ne se chargent qu’après consentement.

Politique de confidentialité