- Catalog total load
- 210 kW
- Miner positions
- 20 Units
- Electrical input
- 380-400V
Miner referenceWhatsMiner M53/M63 Hydro series
Mining infrastructure · Hydro cooling
Build inside an existing facility, with room to expand one cabinet at a time.


Deploy hydro cabinets inside an existing facility and plan the route to the external cooler. Expand around the available space and electrical capacity.
Inside the system

AI-generated concept based on the product exterior. Internal arrangement and quantities are illustrative; final configuration is subject to confirmation.
View product ↗The heat exchanger and fan form the heat-rejection end of the system. Its selection needs to match the miner heat load and the site operating conditions.
The central rack area holds the miners and their liquid connections. The exact miner model, chassis dimensions and operating mode determine the usable rack configuration.
The pipework connects the miner loop with the heat-rejection section. Interface locations, liquid requirements and the boundary between factory and site connections belong in the configuration review.
The highlighted equipment area illustrates circulation and supporting liquid-loop equipment. Confirm pump selection, applicable monitoring and service access against the agreed system configuration.
The cabinet area brings electrical distribution and controls into the system layout. Review the equipment input, upstream supply, protection and monitoring interfaces together.
System planning

Review the complete model, chassis and operating mode before choosing rack positions and connections.
Plan miners, supply and return pipework, pumps and the heat-rejection or heat-use equipment together.
Include service aisles, component replacement and future deployment phases in the layout.
Equipment: confirm system model, quantity, included components, miner inclusion and spare parts in the quotation.
Site work: agree transport, unloading, foundations, external connections, installation and commissioning responsibilities separately.
01 / System collection
Miner referenceWhatsMiner M53/M63 Hydro series
Power & cooling

Compare equipment input with the available site voltage and capacity. Include auxiliary loads, protection, monitoring and expansion requirements.
Already have a transformer or cooling plant? Share its nameplate, drawings and operating records to review what can be retained.
Discuss site interfaces ↗Start with the project country, miner models and target capacity if known. Site power, cooling conditions and your equipment list help define the configuration.
Start with your project
Share what you know. We’ll review the miner, site requirements and scope before confirming a configuration.
System collection:Hydro cabinets
Miner referenceAntminer S19/S21 Hydro series
Miner referenceReview the exact miner model