HostingBlog
ProductCooling SystemsProfit RankingHostingBlogAbout UsMore
CartLeedMiner

Your cart is empty

Browse products or send a quote request when you are ready.

Browse miners
Loading

Leedminer offers competitive miner prices, accelerating your Return on Investment (ROI).

+86 133 5291 7253info@leedminer.com

Information

  • Shop
  • My Account
  • Miners' Profitability
  • Coin List
  • Halving Countdown
  • Blog

Support

  • Contact Us
  • FAQs
  • Payment Methods
  • Return & Warranty
  • Terms & Conditions
  • Privacy Policy

Company

  • About Us
  • Our Team
  • Exhibitions
  • Partners
  • Fraud Prevention
LEEDMINER

© 2017-2026 LeedMiner All rights reserved. Storefront locale English · leedminer.com

We use cookies to improve your experience.

Cookie Settings

We use essential cookies for cart and account sessions. Optional analytics and marketing scripts only load after consent.

Privacy Policy
Loading
Home/Cooling systems/Hydro cooling solutions/Hydro cabinets/SR 34-S for Antminer T-type
CoolSpace SR34-S product view

CoolSpace SR34-S

Hydro cabinets

For Antminer S19/S21 Hydro series. Review the miner configuration and site connections for your project.

Catalog total load
210 kW
Catalog capacity
34 Units
Cooling
Water Cooling
Electrical input
3-phase+N+PE, 380-415V AC, 50Hz
Quoted for your project

Equipment, miner compatibility and delivery scope are confirmed in your quote.

Request a quote ↗View specifications ↓
CoolSpace SR34-S
OverviewCompatibilitySpecificationsSite requirements
Request a quote ↗

01 / Compatibility

The right system starts with the right fit.

A miner series is an initial guide. Exact models, running modes and site conditions determine the final configuration.

Miner referenceStill to confirm
Antminer S19/S21 Hydro seriesExact model, mode, quantity, electrical input and coolant conditions.

Physical space does not guarantee full-load operation for every miner. Listed catalog conditions are not a site test record.

Check my configuration →

Miner earnings reference

Antminer S19 Hydro (158Th)

158 TH/S · 34.5 J/Th

Miner net profit -$0.62/dayMiner quantity: 34Est. total net profit -$21.10/day
↗
Antminer S21 Hyd (302Th)

302 TH/S · 16 J/Th

Miner net profit $4.85/dayMiner quantity: 34Est. total net profit $164.83/day
↗

Estimated at $0.045/kWh using catalog miner data. Full-load figures assume one model in every listed slot, exclude pumps, fans and other auxiliary loads, and require site power and cooling review. Earnings vary with network conditions.

03 / Technical reference

Technical specifications

Catalog reference values must be checked against the selected configuration. Miner load, heat rejection and auxiliary power are different measurements.

Manufacturer technical reference ↗

Cabinet height needs confirmation: the catalog lists 2250 mm, while the manufacturer reference lists 2400 mm. Confirm the supplied configuration before planning installation.

Electrical & load

Catalog total load
210 kW
Electrical input
3-phase+N+PE, 380-415V AC, 50Hz

Cooling & operating conditions

Cooling method
Water Cooling
Catalog heat dissipation
> 200 kW
Catalog system power
10 kW
Catalog ambient range
−20 °C to 45 °C
Pump
3.5 kW · 25 m³/h

Dimensions & equipment

Format / dimensions
Cabinet 1350 x 800 x 2250 mm; Drycooler 2350 x 1350 x 2400 mm
Catalog system composition
Dry-cooler module ×1 + integrated liquid-cooling power cabinet ×1

Monitoring & protection

Monitoring
PLC intelligent control console
Network
2 × 24-port Gigabit switches

Values are catalog references. Heat rejection depends on the stated ambient and fluid conditions; missing conditions require review. Listed standards require matching certificates for the supplied configuration.

Site readiness

Prepare the site, not just the equipment.

Bring these values to your site review

Equipment dimensions are not the full installation footprint. Confirm maintenance clearance, foundations, lifting access and connection routes in the site plan.

Electrical input
3-phase+N+PE, 380-415V AC, 50Hz

Before selection

Miner specifications, available site power and environmental conditions.

Before delivery

Layout, foundations, access, electrical and liquid connection responsibilities.

Before commissioning

Agreed connections, network, fluid preparation and acceptance checklist.

Frequently asked questions

Answers about configuration, equipment and project support.

Start with the project country, miner models and target capacity if known. Site power, cooling conditions and your equipment list help define the configuration.

Start with your project

Discuss your SR 34-S for Antminer T-type configuration

Share what you know. We’ll review the miner, site requirements and scope before confirming a configuration.

SR 34-S for Antminer T-type
Purpose: Project quote
Requested options are subject to review.
Add miner and configuration details

Loading security check…