Mining Hosting:
الطريقة الأسهل لتعدين العملات الرقمية
هل تريد التعدين دون تشغيل منشأة خاصة بك؟ مع LeedMiner يمكنك شراء أجهزة ASIC عالية الأداء بينما يربطك فريقنا بمزودي استضافة موثوقين. نجمع بين خبرة القطاع وشبكة عالمية وحلول مخصصة لمساعدتك في بناء خطة تعدين طويلة الأجل.
- Locations
- 4 regions
- Starting power
- $0.055/kWh
- Provider handoff
- Contract first
4مواقع الاستضافةEnergy sites
مواقع الاستضافة
أرسل طراز ASIC والكمية والتاريخ والموقع. يؤكد المزود السعة والعقد قبل الشحن.




LeedMiner introduces independent hosting providers. Review all service terms and sign a contract with your selected provider before deployment. Hosting service and support are provided by the selected provider.
ASIC hosting cost model
Compare Bitcoin miner hosting electricity cost by ASIC
This table uses current public catalog hashrate and nameplate power to estimate 30 days of continuous operation, then applies the lowest and highest listed hosting electricity rates on this page.
Listed hosting electricity range: $0.055–$0.075/kWh| ASIC miner | Cooling | Hashrate | Power | Efficiency | 30-day energy | 30-day electricity range |
|---|---|---|---|---|---|---|
| Antminer S23 XP Hyd (600Th) | Hydro | 600 TH/s | 5,340 W | 8.9 J/TH | 3,845 kWh | 211.46 US$–288.36 US$ |
| Antminer S23 Hyd (563Th) | Hydro | 563 TH/s | 5,510 W | 9.79 J/TH | 3,967 kWh | 218.20 US$–297.54 US$ |
| Antminer S23e U2H Hyd | Hydro | 865 TH/s | 8,650 W | 10 J/TH | 6,228 kWh | 342.54 US$–467.10 US$ |
| Bitdeer Sealminer A3 Pro Hydro | Hydro | 660 TH/s | 8,250 W | 12.5 J/TH | 5,940 kWh | 326.70 US$–445.50 US$ |
| Whatsminer M73S+ | Hydro | 570 TH/s | 7,125 W | 12.5 J/TH | 5,130 kWh | 282.15 US$–384.75 US$ |
| Whatsminer M76S+ | Air | 416 TH/s | 5,200 W | 12.5 J/TH | 3,744 kWh | 205.92 US$–280.80 US$ |
| Bitdeer Sealminer A3 Pro Air | Air | 290 TH/s | 3,625 W | 12.5 J/TH | 2,610 kWh | 143.55 US$–195.75 US$ |
| Whatsminer M70S+ | Air | 262 TH/s | 3,275 W | 12.5 J/TH | 2,358 kWh | 129.69 US$–176.85 US$ |
Formula: nameplate power × 24 hours × 30 days. The estimate covers electricity only and excludes setup fees, management, repairs, downtime, curtailment, pool fees, and coin-price changes. Confirm final terms in the provider contract and against metered usage.
Mining hosting FAQ
ASIC miner hosting places mining hardware in a third-party facility that supplies power, networking, cooling, monitoring, and on-site operations. Miner purchase, hosting contract, and mining payouts should be reviewed separately.
Process
كيف تبدأ
Operations fit
لماذا تختار الاستضافة؟
هل تواجه هذه المشكلات؟
لا تملك الوقت لصيانة مزرعة التعدين؟
تريد التعدين ولا تملك موقعاً خاصاً؟
تفتقر إلى المعرفة التقنية للتعدين؟
تكلفة الكهرباء في منطقتك مرتفعة؟
تساعدك الاستضافة على حل هذه المشكلات.
فنيون للصيانة والإصلاح
منشآت آمنة وموثوقة
زيادة العائد على الاستثمار
تسريع فترة استرداد التكلفة
الاستفادة من أسعار كهرباء منخفضة

