Mining Hosting:
A forma simples de minerar criptomoedas
Quer minerar sem operar sua própria instalação? Com a LeedMiner, você compra ASICs de alto desempenho enquanto nossa equipe conecta você a provedores de hospedagem confiáveis. Unimos experiência no setor, rede global e soluções sob medida para ajudar no planejamento de uma operação sustentável.
- Locations
- 4 regions
- Starting power
- $0.055/kWh
- Provider handoff
- Contract first
4Locais de hospedagemEnergy sites
Locais de hospedagem
Informe modelo ASIC, quantidade, data e local. O provedor confirmará capacidade e contrato antes do envio.




LeedMiner introduces independent hosting providers. Review all service terms and sign a contract with your selected provider before deployment. Hosting service and support are provided by the selected provider.
ASIC hosting cost model
Compare Bitcoin miner hosting electricity cost by ASIC
This table uses current public catalog hashrate and nameplate power to estimate 30 days of continuous operation, then applies the lowest and highest listed hosting electricity rates on this page.
Listed hosting electricity range: $0.055–$0.075/kWh| ASIC miner | Cooling | Hashrate | Power | Efficiency | 30-day energy | 30-day electricity range |
|---|---|---|---|---|---|---|
| Antminer S23 XP Hyd (600Th) | Hydro | 600 TH/s | 5.340 W | 8,9 J/TH | 3.845 kWh | US$ 211,46–US$ 288,36 |
| Antminer S23 Hyd (563Th) | Hydro | 563 TH/s | 5.510 W | 9,79 J/TH | 3.967 kWh | US$ 218,20–US$ 297,54 |
| Antminer S23e U2H Hyd | Hydro | 865 TH/s | 8.650 W | 10 J/TH | 6.228 kWh | US$ 342,54–US$ 467,10 |
| Bitdeer Sealminer A3 Pro Hydro | Hydro | 660 TH/s | 8.250 W | 12,5 J/TH | 5.940 kWh | US$ 326,70–US$ 445,50 |
| Whatsminer M73S+ | Hydro | 570 TH/s | 7.125 W | 12,5 J/TH | 5.130 kWh | US$ 282,15–US$ 384,75 |
| Whatsminer M76S+ | Air | 416 TH/s | 5.200 W | 12,5 J/TH | 3.744 kWh | US$ 205,92–US$ 280,80 |
| Bitdeer Sealminer A3 Pro Air | Air | 290 TH/s | 3.625 W | 12,5 J/TH | 2.610 kWh | US$ 143,55–US$ 195,75 |
| Whatsminer M70S+ | Air | 262 TH/s | 3.275 W | 12,5 J/TH | 2.358 kWh | US$ 129,69–US$ 176,85 |
Formula: nameplate power × 24 hours × 30 days. The estimate covers electricity only and excludes setup fees, management, repairs, downtime, curtailment, pool fees, and coin-price changes. Confirm final terms in the provider contract and against metered usage.
Mining hosting FAQ
ASIC miner hosting places mining hardware in a third-party facility that supplies power, networking, cooling, monitoring, and on-site operations. Miner purchase, hosting contract, and mining payouts should be reviewed separately.
Process
Como começar
Operations fit
Por que escolher hospedagem?
Você enfrenta estes problemas?
Não tem tempo para manter sua fazenda de mineração?
Quer minerar, mas não tem um local próprio?
Falta conhecimento técnico para minerar?
O custo de energia na sua região é muito alto?
A hospedagem ajuda você a resolver estes problemas.
Técnicos disponíveis para manutenção e reparo
Instalações seguras e confiáveis
Aumente seu ROI
Acelere o prazo de retorno
Aproveite tarifas de energia mais baixas

