Hydro containers
ANTSPACE HD5
- Catalog total load
- 1500 kW
- Miner positions
- To be confirmed
- Electrical input
- 400V ±5%, 50/60Hz
Miner referenceReview the exact miner model
Mining infrastructure · Hydro cooling
Plan a dedicated mining site around your miners, power and available space.
Inside the system
AI-generated concept based on the product exterior. Internal arrangement and quantities are illustrative; final configuration is subject to confirmation.
View product ↗The heat exchanger and fan form the heat-rejection end of the system. Its selection needs to match the miner heat load and the site operating conditions.
The central rack area holds the miners and their liquid connections. The exact miner model, chassis dimensions and operating mode determine the usable rack configuration.
The pipework connects the miner loop with the heat-rejection section. Interface locations, liquid requirements and the boundary between factory and site connections belong in the configuration review.
The highlighted equipment area illustrates circulation and supporting liquid-loop equipment. Confirm pump selection, applicable monitoring and service access against the agreed system configuration.
The cabinet area brings electrical distribution and controls into the system layout. Review the equipment input, upstream supply, protection and monitoring interfaces together.
01 / System collection
Hydro containers
Miner referenceReview the exact miner model
Hydro containers
Inside hydro cooling


Miner connections
Manifolds distribute coolant along the racks, while individual hoses connect the miners to the circuit. The miner model determines the connection layout.

Coordinate container placement, upstream power and cooling connections in one site plan. Reserve access for unloading, maintenance and later phases.
System planning

Review the complete model, chassis and operating mode before choosing rack positions and connections.
Plan miners, supply and return pipework, pumps and the heat-rejection or heat-use equipment together.
Include service aisles, component replacement and future deployment phases in the layout.
Equipment: confirm system model, quantity, included components, miner inclusion and spare parts in the quotation.
Site work: agree transport, unloading, foundations, external connections, installation and commissioning responsibilities separately.
Start with your project
Share what you know. We’ll review the miner, site requirements and scope before confirming a configuration.
System collection:Hydro containers
Miner referenceReview the exact miner model
Hydro containers
Miner referenceWhatsMiner M53/M63 Hydro series
Miner referenceAntminer S19/S21 Hydro series
Hydro containers
Miner reference3U Hydro series
Miner referenceReview the exact miner model
Rack dimensions and front clearance affect how equipment is installed and replaced. Check both against the exact miner chassis.

Keep the liquid connections visible and plan room for inspection, tools and component replacement between the racks.
Video walkthrough · 01:05
A walkthrough of pipework, tanks, valves and miner racks. Use the player controls to pause and inspect a detail.


Photos, video and illustrations show layout references. Equipment shown is not a standard inclusion for every model; confirm the model and supply scope for your project.
Power & cooling

Compare equipment input with the available site voltage and capacity. Include auxiliary loads, protection, monitoring and expansion requirements.
Already have a transformer or cooling plant? Share its nameplate, drawings and operating records to review what can be retained.
Discuss site interfaces ↗Start with the project country, miner models and target capacity if known. Site power, cooling conditions and your equipment list help define the configuration.