What should you do if there is high-frequency noise in the junction box when the fan is running at full speed?
In general, this issue might arise due to the loose fastening of screws on the internal PCB board of the junction box. You should dismantle the junction box and tighten the screws securely. If the screws cannot be tightened, you can try to replace the screws or add gaskets to tighten the screws (M3 screws and gaskets). If the problem persists, you can try to add gaskets (preferably rubber anti-vibration pads) at the bottom of the dry cooler to raise the fan to prevent noise caused by contact between the bottom of the dry cooler and the ground.
How to properly unload oil to avoid waste?
First, pump the oil out using the oil filling pump in the accessories. At the same time, there is an oil discharge port in the middle of the liquid separator plate at the bottom of the tank. After removing the screw, plug the oil filling pump in to clean up the liquid at the bottom of the liquid separator plate.
How does the oil filling pump work in accessories?
Instructions1. Connect the pump to the inlet and outlet pipes: Ensure a tight seal between the pipes and the pump to prevent low pressure or leakage. The arrow on the pump head indicates the direction of the outlet.2. Put the water inlet pipe below the coolant level, and put the water outlet pipe in the corresponding storage coolant receptacle.3. Connect the pump to the pump power adapter and then power on.
What is the material of C2 kit?
The material of C2 tank is cold-rolled steel , the dry cooler is copper and aluminum fins.
If the C2 pump stops or reports an error, what will happen?
If the pump stops working, a “Pump Error” prompt will appear on our Tank’s display screen, accompanied by an alarm sound. If this situation is not addressed, the temperature of the coolant will continue to rise due to the inability to dissipate heat. Eventually, this will trigger the temperature protection mechanism of the mining rigs, causing them to stop operating automatically.