live
Realtime Mining Profit
$0.00 /day
ROI: N/A days
as of 20th September 2024

Immersion Cooling BC20

$47,800.00 $77,200.00
BC10-1
CE UL
B100*1 B24*2 B24*4
Coinpal2
Guaranteed safe & secure checkout

Description

Leedminer Immersion Cooling for Crypto Mining

——Provide from Home Mining to Large-scale Mining Solutions

IMMERSION COOLING CONTAINER BC20——Designed for large-scale mining

Liquid Immersion Cooling: Technical Advantages

  • Precise temperature control – Provides a controlled environment for chipsets and eliminates “electron migration phenomena” caused by high heat.

  • Stable operation – Reduces failures, increases uptime-rate close to 100%.
  • Longer lifecycle – The mining machines are isolated from the air and free from dust, static electricity, short circuit, oxidation, and fan vibration, extending the lifecycle of the mining machine to more than 5 years in average.
  • Low noise – Eliminates the noise problem of air cooling and allows to deploy in residential and commercial areas.
  • Overclocked hashrate – Up to 60% of hashrate overclocking will shorten the return cycle and boost the ROI.
  • Reduced O&M cost – Stable operating capability combined with FH remote monitoring system can reduce maintenance costs by up to 90%.
  • Lower cooling cost – FH intelligent power management system can reduce cooling energy consumption (PUE 1.02~1.05) and carbon emission more effectively.
 

Specification

BC20 MEGA Container

BASIC
PRO
Dimensions(L*W*H)(mm)5820*2438*28965820*2438*2896
Shipping Weight(T)77
Operating Weight(T)1212
Coolant Capacity (L)70007000
Cycle ModeSingle loopSingle loop
Miner Capacity192 S19/M50

192 S19 / 240 M50

Tank QuantityB24 Tank*8B24 Tank*8
Operating Temperature(℃)-25°C ~55℃-25°C ~55℃

Electrical Performance (- /✓ optional/standard)

BASIC
PRO
Input Voltage and Frequency3-phase 350-480V 50/60Hz3-phase 350-480V 50/60Hz
Max Power Load (kW)8991411
Output Voltage and FrequencySingle-phase 200-277V 50/60HzSingle-phase 200-277V 50/60Hz
Safety CertificationCE/ULCE/UL
Operating Power(kW)5067
Power Distribution Cabinets(A)630Ax1 *21000Ax1 *2
PDU

Smart PDU * 8

Smart PDU * 16

Inlet CableThe inlet cables can withstand high-voltage of above 600V, with the following requirements per phase:L1 4-wires cable 1AWG(42.4mm x4) x1 *2L2 4-wires cable 1AWG(42.4mm x4) x1 *2L3 4-wires cable 1AWG(42.4mm x4) x1 *2N 4-wires cable 1AWG(42.4mm x4) x1 *2PE 1-wire cable 1AWG(42.4mm) x1 *2The inlet cables can withstand high-voltage of above 600V, with the following requirements per phase:L1 4-wires cable 3/0AWG(85mm x4) x1 *2L2 4-wires cable 3/0AWG(85mm x4) x1 *2L3 4-wires cable 3/0AWG(85mm x4) x1 *2N 4-wires cable 3/0AWG(85mm x4) x1 *2PE 1-wire cable 3/0AWG(85mm) x1 *2
Smart Meter
Integrated Wiring
Network
UPS
SPD

 

Cooling Capacity

BASIC
PRO
Cooling Capacity(kW)7200960
Cooling Type

Closed water cooling tower

or Dry cooler

Closed water cooling tower

or Dry cooler

Inlet Temperature(℃)4545
Outlet Temperature(℃)6060
Design Reference Temperature (℃)3535

 

Note

About the transportation of liquid cooling equipment

For most areas, the liquid cooling equipment will be shipped to you via sea freight. Ports and receiving points in different regions will incur different shipping charges. It is recommended that you contact customer service to confirm address details and calculate shipping costs before placing an order.

Advisory Service

Please send us your RFQ to get your exclusive sales manager assistance.

Please enable JavaScript in your browser to complete this form.

Service Process

数字1
Project requirement analysis
with Leedminer’s engineering team
数字2
Customized solution design
based on the customer’s unique requirements
数字3
Deliver guaranteed
by Leedminer within 30 days after payment
数字4
Deployment support
by Leedminer remotely or on-site including technical support and training
数字5
After-sales support
provided by Leedminer for 1-year warranty and free service, then up to service
Spot order:

All orders will be dispatched within 2 working days after full payment is received.

Futures order:

All orders will be dispatched within 2 working days of factory delivery. Also, full payment is required before shipping.

Shipping carrier:

We usually ship orders via DHL, UPS, FedEX, TNT or DDP dedicated line.

Delivery time:

International delivery usually takes about 5-8 business days.
DDP shipping usally takes 8-12 days.

Foghashing

"Fog Hashing" originates from the terminology of "Fog Computing"which was proposed by Cisco in 2011 and will play an important role in the future of a digital world. Fog Hashing is a leading crypto mining technology provider from Singapore, with a vision to make blockchain computing infrastructure more EFFICIENT, SUSTAINABLE and ROBUST. Leveraging its advanced liquid cooling technology, both ultimate efficiency and overclocked hashrate are achieved, thus significantly increasing the ROI of crypto mining.

Related products