Immersion Cooling BC10
Description
Leedminer Immersion Cooling for Crypto Mining
——Provide from Home Mining to Large-scale Mining Solutions
IMMERSION COOLING CONTAINER BC10——Designed for large-scale mining
Liquid Immersion Cooling: Technical Advantages
Precise temperature control – Provides a controlled environment for chipsets and eliminates “electron migration phenomena” caused by high heat.
- Stable operation – Reduces failures, increases uptime-rate close to 100%.
- Longer lifecycle – The mining machines are isolated from the air and free from dust, static electricity, short circuit, oxidation, and fan vibration, extending the lifecycle of the mining machine to more than 5 years in average.
- Low noise – Eliminates the noise problem of air cooling and allows to deploy in residential and commercial areas.
- Overclocked hashrate – Up to 60% of hashrate overclocking will shorten the return cycle and boost the ROI.
- Reduced O&M cost – Stable operating capability combined with FH remote monitoring system can reduce maintenance costs by up to 90%.
- Lower cooling cost – FH intelligent power management system can reduce cooling energy consumption (PUE 1.02~1.05) and carbon emission more effectively.
Specification
BC10 CONTAINER
– | BASIC | PRO |
Dimensions(L*W*H)(mm) | 2991*2438*2591 | 2991*2438*2591 |
Shipping Weight(T) | 3 | 3 |
Operating Weight(T) | 6 | 6 |
Coolant Capacity (L) | 3600 | 3600 |
Cycle Mode | Single loop | Single loop |
Miner Capacity | 96 S19/M50 | 96 S19/M50 |
Tank Quantity | B24 Tank*4 | B24 Tank*4 |
Operating Temperature(℃) | -25°C ~55℃ | -25°C ~55℃ |
Electrical Performance (- /✓ optional/standard)
– | BASIC | PRO |
Input Voltage and Frequency | 3-phase 350-480V 50/60Hz | 3-phase 350-480V 50/60Hz |
Max Power Load (kW) | 444 | 706 |
Output Voltage and Frequency | Single-phase 200-277V 50/60Hz | Single-phase 200-277V 50/60Hz |
Safety Certification | CE/UL | CE/UL |
Operating Power(kW) | 25 | 33 |
Power Distribution Cabinets(A) | 630Ax1 *1 | 1000Ax1 *1 |
PDU | Smart PDU * 4 | Smart PDU * 8 |
Inlet Cable | The inlet cables can withstand high-voltage of above 600V, with the following requirements per phase:L1 4-wires cable 1AWG(42.4mm x4) x1 *1L2 4-wires cable 1AWG(42.4mm x4) x1 *1L3 4-wires cable 1AWG(42.4mm x4) x1 *1N 4-wires cable 1AWG(42.4mm x4) x1 *1PE 1-wire cable 1AWG(42.4mm) x1 *1 | The inlet cables can withstand high-voltage of above 600V, with the following requirements per phase:L1 4-wires cable 3/0AWG(85mm x4) x1 *1L2 4-wires cable 3/0AWG(85mm x4) x1 *1L3 4-wires cable 3/0AWG(85mm x4) x1 *1N 4-wires cable 3/0AWG(85mm x4) x1 *1PE 1-wire cable 3/0AWG(85mm) x1 *1 |
Smart Meter | – | ✓ |
Integrated Wiring | ✓ | ✓ |
Network | ✓ | ✓ |
UPS | – | – |
SPD | ✓ | ✓ |
Cooling Capacity
– | BASIC | PRO |
Cooling Capacity(kW) | 360 | 480 |
Cooling Type | Closed water cooling tower or Dry cooler | Closed water cooling tower or Dry cooler |
Inlet Temperature(℃) | 45 | 45 |
Outlet Temperature(℃) | 60 | 60 |
Design Reference Temperature (℃) | 35 | 35 |
Note
About the transportation of liquid cooling equipment
For most areas, the liquid cooling equipment will be shipped to you via sea freight. Ports and receiving points in different regions will incur different shipping charges. It is recommended that you contact customer service to confirm address details and calculate shipping costs before placing an order.
Advisory Service
Please send us your RFQ to get your exclusive sales manager assistance.
Service Process
Spot order:
All orders will be dispatched within 2 working days after full payment is received.
Futures order:
All orders will be dispatched within 2 working days of factory delivery. Also, full payment is required before shipping.
Shipping carrier:
We usually ship orders via DHL, UPS, FedEX, TNT or DDP dedicated line.
Delivery time:
International delivery usually takes about 5-8 business days.
DDP shipping usally takes 8-12 days.
Accepted payment methods:
1. Bank transfer/Wire transfer (T/T)
2. USDT
3. For other methods, please consult our sales expert.
*All machine price is fluctuating based on the crypto market so our quotes are only valid on the day of publication.*
Products sold by Leed Miner Limited are excluded of all value added taxes and customs duties. Clients will be solely responsible for paying any outstanding taxes and duties in accordance with your country’s law and customs regulations. If the products is returned to us due to the custom clearance issues, clients is required to pay the return shipping costs.
However, we also provide DDP shipping services to certain countries.
Countries that support DDP Shipping: United States, Germany, Russia, Dubai, United Kingdom, France, Belgium, Luxembourg, Netherlands, Denmark, Czech Republic, Poland, Austria, Ireland, Portugal, Sweden, Spain, Vietnam, Thailand, Malaysia (Note : some countries only accept the orders over 30Kg).
For more details, please contact us for consultation.
We offer:
1. Marketing Photos and Video Package
2. Competitive Wholesale Prices
3. Support Dropshipping Service
4. Technical Support
Foghashing
Question & Answer
There are no question found.