live
Realtime Mining Profit
$0.00 /day
ROI: N/A days
as of 19th septiembre 2024

Hydro cooling H200-M

Coinpal2
Garantía de segura y segura de compra

Description

Leedminer Immersion Cooling for Crypto Mining

——Provide from Home Mining to Large-scale Mining Solutions

200kW Sufficient Cooling Capacity

Meet the heat dissipation demand of hydro cooling mining system

Compatible with Whatsminer/Antminer Rack System

42U modular rack system design

Designed for Bitcoin Mining Heat Recovery

Solution designed according to heating needs, optional dry cooler or cooling tower

Specification

H200-M

Talla800mm(W)*2100mm(H)*1000mm(D)
System Power Load (MAX)210kW
Miner Capacity20 Whatsminer M63s
Input Voltage3-Phase 380V-415V, 50/60Hz
PDU20 Port SA2-30 Smart PDU
Network1000M Network Switch
Operation Temperature-25℃~45℃
Operating Humidity5%~95%RH
Water ManifoldStainless Steel
HosePE/PTFE Hose + Quick Connects

H200-CDU

Talla800mm(W)*2100mm(H)*1000mm(D)
Cooling Capacity200kW
Potencia3.5kW
Input Voltage3-Phase 380V-480V, 50/60Hz
Cooling MediumPure water/Soften water+Antifreeze+Corrosion Inhibitor
Inlet/Outlet

10°C (Normal)

14°C (High Performance)

Rated Flow Rate20m³/h
Operating Temperature-25℃~45℃
Operating Humidity
5%~95%RH
PLC SystemConstant flow control with pressure
regulation
Communication MethodModbus-RTU,TCP/IP
Design Pressure0.3MPa

 

H200-Dry Cooler

ModeloFHWDC200
ModuleDry Cooler V Type
Cooling Capacity200kW
Wight(Empty Load)800KG
FANs2
ConnectionDN50
FluidCoolant
Fluid flowrate20m³/h
Inlet/Outlet Temperature55℃/40℃
Ambient temperature35℃
Fin/Tube Materials304 Stainless steel,Al-mg/AI
Operating/Maximum Pressure0.3MPA/1.6MPA

 

Note

About the transportation of liquid cooling equipment

For most areas, the liquid cooling equipment will be shipped to you via sea freight. Ports and receiving points in different regions will incur different shipping charges. It is recommended that you contact customer service to confirm address details and calculate shipping costs before placing an order.

Advisory Service

Please send us your RFQ to get your exclusive sales manager assistance.

Por favor, activa JavaScript en tu navegador para completar este formulario.
Pedido al contado:

Todos los pedidos se enviarán en un plazo de 2 días laborables tras la recepción del pago completo.

Orden de futuros:

Todos los pedidos se enviarán en un plazo de 2 días laborables a partir de la entrega en fábrica. Además, se requiere el pago completo antes del envío.

Transportista:

Normalmente enviamos los pedidos a través de DHL, UPS, FedEX, TNT o la línea dedicada de DDP.

Plazo de entrega:

La entrega internacional suele tardar entre 5 y 8 días laborables.
El envío DDP suele tardar entre 8 y 12 días.

Foghashing

"Fog Hashing" originates from the terminology of "Fog Computing"which was proposed by Cisco in 2011 and will play an important role in the future of a digital world. Fog Hashing is a leading crypto mining technology provider from Singapore, with a vision to make blockchain computing infrastructure more EFFICIENT, SUSTAINABLE and ROBUST. Leveraging its advanced liquid cooling technology, both ultimate efficiency and overclocked hashrate are achieved, thus significantly increasing the ROI of crypto mining.

Productos relacionados