Immersion Cooling BC10
Description
Leedminer Immersion Cooling for Crypto Mining
——Provide from Home Mining to Large-scale Mining Solutions
IMMERSION COOLING CONTAINER BC10——Designed for large-scale mining
Liquid Immersion Cooling: Technical Advantages
Precise temperature control – Provides a controlled environment for chipsets and eliminates “electron migration phenomena” caused by high heat.
- Stable operation – Reduces failures, increases uptime-rate close to 100%.
- Longer lifecycle – The mining machines are isolated from the air and free from dust, static electricity, short circuit, oxidation, and fan vibration, extending the lifecycle of the mining machine to more than 5 years in average.
- Low noise – Eliminates the noise problem of air cooling and allows to deploy in residential and commercial areas.
- Overclocked hashrate – Up to 60% of hashrate overclocking will shorten the return cycle and boost the ROI.
- Reduced O&M cost – Stable operating capability combined with FH remote monitoring system can reduce maintenance costs by up to 90%.
- Lower cooling cost – FH intelligent power management system can reduce cooling energy consumption (PUE 1.02~1.05) and carbon emission more effectively.
Specification
BC10 CONTAINER
– | BASIC | PRO |
Dimensions(L*W*H)(mm) | 2991*2438*2591 | 2991*2438*2591 |
Shipping Weight(T) | 3 | 3 |
Operating Weight(T) | 6 | 6 |
Coolant Capacity (L) | 3600 | 3600 |
Cycle Mode | Single loop | Single loop |
Miner Capacity | 96 S19/M50 | 96 S19/M50 |
Tank Quantity | B24 Tank*4 | B24 Tank*4 |
Operating Temperature(℃) | -25°C ~55℃ | -25°C ~55℃ |
Electrical Performance (- /✓ optional/standard)
– | BASIC | PRO |
Input Voltage and Frequency | 3-phase 350-480V 50/60Hz | 3-phase 350-480V 50/60Hz |
Max Power Load (kW) | 444 | 706 |
Output Voltage and Frequency | Single-phase 200-277V 50/60Hz | Single-phase 200-277V 50/60Hz |
Safety Certification | CE/UL | CE/UL |
Operating Power(kW) | 25 | 33 |
Power Distribution Cabinets(A) | 630Ax1 *1 | 1000Ax1 *1 |
PDU | Smart PDU * 4 | Smart PDU * 8 |
Inlet Cable | The inlet cables can withstand high-voltage of above 600V, with the following requirements per phase:L1 4-wires cable 1AWG(42.4mm x4) x1 *1L2 4-wires cable 1AWG(42.4mm x4) x1 *1L3 4-wires cable 1AWG(42.4mm x4) x1 *1N 4-wires cable 1AWG(42.4mm x4) x1 *1PE 1-wire cable 1AWG(42.4mm) x1 *1 | The inlet cables can withstand high-voltage of above 600V, with the following requirements per phase:L1 4-wires cable 3/0AWG(85mm x4) x1 *1L2 4-wires cable 3/0AWG(85mm x4) x1 *1L3 4-wires cable 3/0AWG(85mm x4) x1 *1N 4-wires cable 3/0AWG(85mm x4) x1 *1PE 1-wire cable 3/0AWG(85mm) x1 *1 |
Smart Meter | – | ✓ |
Integrated Wiring | ✓ | ✓ |
Network | ✓ | ✓ |
UPS | – | – |
SPD | ✓ | ✓ |
Cooling Capacity
– | BASIC | PRO |
Cooling Capacity(kW) | 360 | 480 |
Cooling Type | Closed water cooling tower or Dry cooler | Closed water cooling tower or Dry cooler |
Inlet Temperature(℃) | 45 | 45 |
Outlet Temperature(℃) | 60 | 60 |
Design Reference Temperature (℃) | 35 | 35 |
Note
About the transportation of liquid cooling equipment
For most areas, the liquid cooling equipment will be shipped to you via sea freight. Ports and receiving points in different regions will incur different shipping charges. It is recommended that you contact customer service to confirm address details and calculate shipping costs before placing an order.
Advisory Service
Please send us your RFQ to get your exclusive sales manager assistance.
Service Process
ترتيب موضعي:
سيتم إرسال جميع الطلبات في غضون يومي عمل بعد استلام المبلغ كاملاً.
ترتيب العقود الآجلة
سيتم إرسال جميع الطلبات في غضون يومي عمل من تسليم المصنع. كما أن الدفع الكامل مطلوب قبل الشحن.
ناقل الشحن:
نقوم عادةً بشحن الطلبات عبر DHL أو UPS أو FedEX أو TNT أو خط DDP المخصص.
وقت التسليم:
يستغرق التوصيل الدولي عادةً حوالي 5-8 أيام عمل.
يستغرق شحن DDP عادةً من 8 إلى 12 يوماً.
طرق الدفع المقبولة:
1. التحويل المصرفي/التحويل البنكي (T/T)
2. USDT
3. بالنسبة للطرق الأخرى، يُرجى استشارة خبير المبيعات لدينا.
* جميع أسعار الآلات متقلبة بناءً على سوق العملات الرقمية، لذا فإن أسعارنا صالحة فقط في يوم النشر.*
المنتجات التي تبيعها شركة ليد ماينر المحدودة مستثناة من جميع ضرائب القيمة المضافة والرسوم الجمركية. سيكون العميل وحده مسؤولاً عن دفع أي ضرائب ورسوم مستحقة وفقاً لقانون بلدك واللوائح الجمركية. إذا تم إرجاع المنتجات إلينا بسبب مشاكل في التخليص الجمركي، يتعين على العملاء دفع تكاليف إعادة الشحن.
ومع ذلك، نقدم أيضاً خدمات شحن DDP إلى بعض البلدان.
البلدان التي تدعم شحن DDP: الولايات المتحدة، وألمانيا، وروسيا، ودبي، والمملكة المتحدة، وفرنسا، وبلجيكا، ولوكسمبورغ، وهولندا، والدنمارك، وجمهورية التشيك، وبولندا، والنمسا، وأيرلندا، والبرتغال، والسويد، وإسبانيا، وفيتنام، وتايلاند، وماليزيا (ملاحظة: بعض الدول تقبل فقط الطلبات التي تزيد عن 30 كجم).
لمزيد من التفاصيل، يرجى اتصل بنا للاستشارة
نحن نقدم:
1. حزمة الصور التسويقية والفيديو التسويقية
2. أسعار الجملة التنافسية
3. دعم خدمة دروبشيبينغ الدعم
4. الدعم الفني
Foghashing
السؤال والإجابة
لا توجد أي أسئلة تم العثور عليها.